New Energy Battery CTP Module Automatic Line

Product Details
Customization: Available
Cell Form: Square Shell Battery Cell
Supply Cycle: 3 Months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Self-branded
The supplier has 3 Self-brands, check the Audit Report for more information
Customization from Designs
The supplier provides design based customization services
to see all verified strength labels (26)
  • New Energy Battery CTP Module Automatic Line
  • New Energy Battery CTP Module Automatic Line
  • New Energy Battery CTP Module Automatic Line
  • New Energy Battery CTP Module Automatic Line
Find Similar Products
  • Overview
  • Function Description
  • Equipment List
Overview

Basic Info.

Model NO.
Square Shell Battery
Product Capacity
3~5.5gwh /Year
Rhythm
10~17ppm
Qualified Rate
Primary >98%, Secondary ≥ 99.8%
Equipment Failure Rate
≤ 2%
Compatibility
Single and Double Row Modules, 12 to 44 Cells
Application Area
Power Module/Energy Storage Module
Transport Package
Wooden Box
Specification
customized
Trademark
Tech-Shine
Origin
Suzhou, Jiangsuprovince, China
Production Capacity
40 Sets/Year

Product Description

Function Description
  1. The module assembly and testing of square shell battery cells can achieve a rhythm of 10-17PPM.
  2. Bundling module structure, can be assembled with steel strip and plastic strip or double steel strip;
  3. The beginning of the production line can be connected to various forms such as AGVs, conveyor lines, and manual forklifts to achieve battery cell loading. The finished products at the end of the line can be connected to AGV mode PACK lines, manual mode PACK lines, and drum line mode PACK lines.
  4. The multi-layer material frame of the battery cells is directly fed, and the online material frame is automatically disassembled, stacked, and the battery cells are grabbed and put online;
  5. Battery cell pre-treatment 1 can perform functions such as scanning codes, OCV testing, thickness measurement and matching group, plasma cleaning, and NG discharge and replenishment;
  6. Battery cell pre-treatment 2 can perform functions such as module assembly flipping, gluing or coating, reordering, etc., and uses three independent channels to process three different states of cells, achieving to be a battery cell pre-treatment annular line that does not clean off the cells.
  7. The module can be stacked and bundled with single or double row mixed wires, and the module length is compatible;
  8. The module assembly welding section can be used for safety testing, pole positioning, BSB welding, nickel plate welding, welding inspection, module bottom and full size inspection, weighing, caching assembly, automatic box entry, etc;
 
Equipment List
Processe Name Attribute Quantity
1 Cell disassembly, stacking, and transportation   1
2 Battery cell enter assembly line   1
3 Cell pretreatment   1
4 Cell pretreatment 1   1
5 Thickness matching library Core process 1
6 Cell adhesive Core process 1
7 Tear off release Paper   1
8 Adhesive testing   1
9 Cell pretreatment 2   1
10 Adhesive re inspection   1
11 Polarity detection   1
12 Module stacking Core process 1
13 End plate adhesive   1
14 Module bundling Core process 2
15 Pre installed platform   1
16 Module conveying system   1
17 Cross line ladder   4
18 Bottom flatness detection   1
19 Pole positioning   1
20 Laser cleaning   1
21 Cell safety inspection   1
22 BSB assembly installation   1
23 BSB welding Core process 1
24 Nickel plate welding Core process 1
25 Weld sanding   1
26 Weld inspection   1
27 Module safety inspection   1
28 Sampling testing&upper cover installation   1
29 Module size detection   1
30 Bottom flatness detection   1
31 Stand shelf   1
32 Bottom plasma cleaning   1
33 Module weighing   1
34 Module in box Core process 1
35 Lower shell gluing   1
36 PACK trolley   1
37 Material rack   1
38 VISION SYSTEM   1
39 Electrical system   1
40 MES system   1

New Energy Battery CTP Module Automatic Line

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier